Context
A solar panel manufacturer whose production line runs on a complex conveyor network feeding several laminators.
Client
The client did not authorize disclosing its name.

Challenge

The production of solar panels relies on complex conveyor networks. A critical bottleneck often occurs at the lamination stage, which can happen in multiple laminators. Maximizing efficiency here is crucial for overall production throughput, as delays can cascade through the entire solar panel production line.

A key challenge lies in ensuring a smooth and timely supply of panels to each laminator. Each lamination process requires five panels to be present simultaneously. If even one panel is late, the lamination cycle is missed, resulting in production inefficiencies, resource waste and reduced throughput.

Traditional static scheduling methods or simple heuristics struggle to adapt to the dynamic nature of the production environment. Fluctuations in panel arrival times, machine availability and minor disruptions frequently cause bottlenecks and missed lamination opportunities.

Goal

The primary goal was to optimize the flow of solar panels on the conveyor network to increase overall throughput. This involved minimizing delays at laminators by ensuring timely material availability, ultimately aiming for significant cost savings through improved efficiency.

Solution

We developed a sophisticated optimization solution using a Mixed-Integer Programming (MIP) model. This solution effectively overcomes several key challenges:

  • Dynamic prescription: leveraging real-time data on panel positions and laminator statuses, the solution periodically generates updated routing and scheduling instructions to ensure timely delivery of materials while respecting operational constraints, such as preventing collisions and swaps. This dynamic approach handles unpredictable panel arrivals and complex infeed points.
  • Real-time optimization: the optimization engine must be executed very quickly (within a few seconds). This is crucial to ensure that a prescription is generated before the panels move to new positions.
  • Complexity management: the optimization model handles the inherent complexity of the system, which involves tracking numerous solar panels, conveyors and time periods simultaneously.

Besides the conflicting requirements of real-time performance and model complexity, our solution delivered a significant throughput improvement, about 5%, over existing static methods.

Results

Our optimization solution significantly improved the client’s lamination operations, resulting in:

  • Reduced delays: significantly fewer idle laminators due to missing panels.
  • Increased throughput: measurable increase in the number of solar panels laminated per hour.
  • Enhanced efficiency: streamlined the lamination process, minimizing wasted time and resources.
  • Cost savings: substantial savings achieved through reduced delays and increased throughput.

This project demonstrates our ability to solve complex manufacturing optimization challenges, delivering tangible results and a significant return on investment.

See more case studies in Manufacturing

Facing a similar challenge?

Every operation has its own constraints. Tell us what you have in mind and we will talk about what could be done in your case, with no obligation.